Commissioning of a Liquid Sulfur Storage Tank - Engineering Experts
Cases

Commissioning of a Liquid Sulfur Storage Tank

For a leading player in the chemical industry, Engineering Experts delivered the complete engineering and commissioning of a new installation...

For a leading player in the chemical industry, Engineering Experts delivered the complete engineering and commissioning of a new installation for the storage of liquid sulfur. From concept to final handover, we took full responsibility for the project, with one clear focus: a safe, reliable, and high‑performance installation from day one.

Challenge: Critical Process Conditions and High Safety Requirements

The storage of liquid sulfur involves specific technical challenges. The product must remain liquid at all times, requiring precise control of temperature, pressure, and flow.
A properly designed system for steam tracing, insulation, and instrumentation is therefore essential. At the same time, the entire installation had to comply with strict safety standards, including ATEX zoning and pressure equipment regulations (PED).

Our Approach: Integrated Engineering from A to Z

Engineering Experts was responsible for the complete design and coordination of the installation:
  • Mechanical and process engineering: piping layouts, sizing, isometrics, and support structures
  • Electrical design: cable routing, grounding, and connection of field instrumentation
  • Instrumentation: selection and specification of, among others, radar level measurement, pressure and temperature sensors, and flow measurements
  • Steam system: design and integration of a new steam pressure‑reducing skid in accordance with PED guidelines
Thanks to this integrated approach, we were able to perfectly align all disciplines and deliver a robust and reliable installation.

Commissioning: A Controlled Path to Operational Reliability

Following construction, Engineering Experts led the complete commissioning of the installation. This phase was carried out using a structured, safety‑first approach, with every component thoroughly tested and validated.
Key steps in the commissioning process included:
  • I/O testing and signal verification between field devices and the control system
  • Calibration of instrumentation to ensure accurate measurements
  • Functional testing of control valves and pumps
  • Leak testing of process and steam piping
  • Phased start‑up of the steam system, with gradual pressure build‑up and inspection
This approach ensured maximum control and allowed any deviations to be detected and corrected at an early stage.

Result: Safe, Stable, and Ready for Continuous Operation

The installation was successfully commissioned without any incidents. From day one, it met all expectations in terms of safety, reliability, and performance.
  • Fully operational installation within design conditions
  • Accurate and stable instrumentation
  • Leak‑free and reliable steam system
  • Complete documentation and handover to the client
  • Ready for safe and continuous production use

Why This Project Makes a Difference

This case demonstrates the strength of an integrated approach: one partner, one team, from engineering through commissioning.
By assigning the same experts responsibility for both design and start‑up, we ensure that installations are not only correctly designed but also perform effectively in real‑world operation.
At Engineering Experts, we take ownership of the entire journey. From the first sketch to final delivery, we deliver installations that are safe, reliable, and future‑proof.
Because strong engineering does not stop at design — it proves itself in execution.
Cases

Discover more recent cases

Repair of a Corroded Blowdown Tank – Ensuring Safety and Operational Continuity

At one of our industrial clients, it was identified that the bottom of a blowdown tank had become severely corroded...

View the case
Repair of a Corroded Blowdown Tank – Ensuring Safety and Operational Continuity
Replacement of a Feed Chute Under a Tight Deadline

At an industrial facility, it was determined that a feed chute – a crucial component in the raw material supply...

View the case
Replacement of a Feed Chute Under a Tight Deadline
Placement of Tanks within a Building – Chemical Sector

At a leading customer in the chemical industry, we fully renewed the storage capacity for a high-grade technical product. The...

View the case
Placement of Tanks within a Building – Chemical Sector
Removal of an Old Sulfur Pipeline with Asbestos-Containing Insulation

PVS Chemicals Belgium recently removed an old sulfur pipeline with asbestos-containing insulation in the Ghent port area. This crucial intervention paves the way for a new, sustainable pipeline, allowing the company to once again transport liquid sulfur by ship. A safe operation with a significant impact on future operations—discover how this project was carried out.

View the case
Removal of an Old Sulfur Pipeline with Asbestos-Containing Insulation
PVS Chemicals – Lifting and Transport of a 45-Tonne Tank in Ghent

At PVS Chemicals in Ghent, a 45-tonne tank was recently installed to increase production capacity. For this project, we collaborated with Sarens, who handled the lifting and transport work, including the necessary engineering, preparation of lifting, transport, and tackle plans, as well as project supervision during the operations. Engineering Experts took care of all other project-related engineering and project coordination.

View the case
PVS Chemicals – Lifting and Transport of a 45-Tonne Tank in Ghent
The Importance of Accuracy in Civil Works – in Collaboration with Group Suerickx

Engineering Experts, in collaboration with Group Suerickx, took on the ambitious challenge of dismantling a production unit in southern France and rebuilding it in Belgium. This project highlights the importance of accuracy in civil works, where precision, alignment, and craftsmanship were key at every stage. The result: a civil structure ready to support the heaviest loads. Discover how this impressive engineering feat came to life.

View the case
The Importance of Accuracy in Civil Works – in Collaboration with Group Suerickx
Industrial piping projects

Engineering Experts delivers precision and reliability in industrial piping projects. From pipe sizing and stress analysis to isometric drawings and compliance with PED, ASME, and DIN standards, we ensure safe, efficient, and fully compliant installations. Our detailed technical files, pressure testing, and clear communication guarantee smooth project execution from start to finish.

View the case
Industrial piping projects
New SO3 converter with heat recovery

For a global player active in the production of sulfur-based chemicals of the highest purity, our consultants were responsible for engineering coordination, procurement of goods and services, and project and construction management.

View the case
New SO3 converter with heat recovery
Heat recuperation cement production

Feasibility study energy recovery cement manufacturing plant. Recovering hot air to reduce burner gas consumption.

View the case
Heat recuperation cement production
Optimization of safety in crane boom

Optimization of a walking platform and shielding of a telescopic conveyor in crane arm. To improve safety.

View the case
Optimization of safety in crane boom
Process design Polyol plant

Explore the process design of a polyol plant. Learn about the steps, technologies and innovations that contribute to the efficient and sustainable production of polyols. Improve your knowledge and optimize your production process.

View the case
Process design Polyol plant
Boiler room renovation VME

At the request of some VMEs, outdated central boiler rooms were addressed so that they can once again produce pleasant heat for their residents for several decades.

View the case
Boiler room renovation VME
Swing out HS cables

Have you ever wondered how those high-voltage cables in the Belgian landscape react in extreme weather conditions?

View the case
Swing out HS cables
Renewal of thermal degasser

One of our core areas of expertise is replacing existing installations. We take care of the entire process from start to finish.

View the case
Renewal of thermal degasser
Project management industrial construction

Our colleague knows his way around. Perfect project management during the construction phase of a beautiful industrial building.

View the case
Project management industrial construction
Rinse water recovery skid

At the request of our client in the food industry to reuse slightly contaminated rinse water further down the production process, a stainless steel skid was designed to both collect this wastewater and transport it to the various users.

View the case
Rinse water recovery skid
Support structure foam tank firefighting system

For a major player in firefighting installation, we performed a static strength calculation for the support structure of a 3-ton foam tank that was set up inside the building.

View the case
Support structure foam tank firefighting system
Pipe stress calculation

For the production expansion of a potato processing plant, a pipe stress calculation of a new steam line starting from the steam collector to the potato peeler was performed.

View the case
Pipe stress calculation
Coca-Cola
Oxfam
Engie
Klima+
Goddeeris
PVS
Siloba
Deconinck Wanson
GPM property management
Callens & Emk
CBR