When a Drinking Water Network Gradually Falls Behind For many companies, a properly functioning drinking water network is taken for...
For many companies, a properly functioning drinking water network is taken for granted. As long as no issues arise, the system often receives little attention. However, over the years, expansions, process changes, and technical modifications can cause the original documentation and the actual installation to diverge significantly. This was the case for an industrial client whose internal drinking water network no longer fully complied with current standards and regulations. The existing setup was insufficiently documented, and not all consumers and connection points were aligned with the applicable regulatory requirements. To prevent future risks and potential non-conformities during inspections, Engineering Experts was asked to conduct a comprehensive evaluation of the installation and develop a compliance roadmap.
The first step involved a thorough assessment of the existing drinking water installation. During this phase, the actual on-site situation was compared with the available documentation. Based on the findings, Engineering Experts updated and upgraded the existing Piping & Instrumentation Diagram (P&ID), ensuring that the drinking water system was once again accurately and comprehensively documented. Next, all consumers and connection points were reviewed and assessed against the applicable standards and Belgaqua guidelines. This analysis identified where the installation deviated from regulatory requirements and determined the technical measures needed to restore compliance. In close cooperation with the inspection body, all identified observations and points of attention were discussed and validated. This resulted in a clear and actionable plan detailing the modifications required to bring the installation fully in line with current regulations. Meanwhile, a contractor has been selected and appointed, and preparations for the execution phase are now underway.
Thanks to this comprehensive analysis, the client now benefits from:
Once the planned modifications have been completed, the installation can be resubmitted for inspection, with the objective of obtaining a positive compliance report and securing a future-proof drinking water infrastructure.
Drinking water systems, utilities, and technical infrastructure often evolve alongside a company’s growth over many years. Individual changes may seem minor in isolation, but over time they can result in an installation that no longer complies with current requirements. By regularly evaluating systems, keeping documentation up to date, and periodically verifying compliance with applicable regulations, companies can avoid unexpected investments, time pressure during inspections, and extensive corrective projects. Preventive asset management remains significantly simpler and more cost-effective than undertaking major corrective actions after years of accumulated changes.
Engineering Experts assists organizations with:
This ensures that installations not only meet today’s requirements but remain compliant and reliable for the future as well.
A Complex Lifting Operation in an Operational Process Environment In the chemical industry, lifting and installation activities often require meticulous...
View the case
For a leading player in the chemical industry, Engineering Experts delivered the complete engineering and commissioning of a new installation...
View the case
At one of our industrial clients, it was identified that the bottom of a blowdown tank had become severely corroded...
View the case
At an industrial facility, it was determined that a feed chute – a crucial component in the raw material supply...
View the case
At a leading customer in the chemical industry, we fully renewed the storage capacity for a high-grade technical product. The...
View the case
PVS Chemicals Belgium recently removed an old sulfur pipeline with asbestos-containing insulation in the Ghent port area. This crucial intervention paves the way for a new, sustainable pipeline, allowing the company to once again transport liquid sulfur by ship. A safe operation with a significant impact on future operations—discover how this project was carried out.
View the case
At PVS Chemicals in Ghent, a 45-tonne tank was recently installed to increase production capacity. For this project, we collaborated with Sarens, who handled the lifting and transport work, including the necessary engineering, preparation of lifting, transport, and tackle plans, as well as project supervision during the operations. Engineering Experts took care of all other project-related engineering and project coordination.
View the case
Engineering Experts, in collaboration with Group Suerickx, took on the ambitious challenge of dismantling a production unit in southern France and rebuilding it in Belgium. This project highlights the importance of accuracy in civil works, where precision, alignment, and craftsmanship were key at every stage. The result: a civil structure ready to support the heaviest loads. Discover how this impressive engineering feat came to life.
View the case
Engineering Experts delivers precision and reliability in industrial piping projects. From pipe sizing and stress analysis to isometric drawings and compliance with PED, ASME, and DIN standards, we ensure safe, efficient, and fully compliant installations. Our detailed technical files, pressure testing, and clear communication guarantee smooth project execution from start to finish.
View the case
For a global player active in the production of sulfur-based chemicals of the highest purity, our consultants were responsible for engineering coordination, procurement of goods and services, and project and construction management.
View the case
Feasibility study energy recovery cement manufacturing plant. Recovering hot air to reduce burner gas consumption.
View the case
Optimization of a walking platform and shielding of a telescopic conveyor in crane arm. To improve safety.
View the case
Explore the process design of a polyol plant. Learn about the steps, technologies and innovations that contribute to the efficient and sustainable production of polyols. Improve your knowledge and optimize your production process.
View the case
At the request of some VMEs, outdated central boiler rooms were addressed so that they can once again produce pleasant heat for their residents for several decades.
View the case
Have you ever wondered how those high-voltage cables in the Belgian landscape react in extreme weather conditions?
View the case
One of our core areas of expertise is replacing existing installations. We take care of the entire process from start to finish.
View the case
Our colleague knows his way around. Perfect project management during the construction phase of a beautiful industrial building.
View the case
At the request of our client in the food industry to reuse slightly contaminated rinse water further down the production process, a stainless steel skid was designed to both collect this wastewater and transport it to the various users.
View the case
For a major player in firefighting installation, we performed a static strength calculation for the support structure of a 3-ton foam tank that was set up inside the building.
View the case
For the production expansion of a potato processing plant, a pipe stress calculation of a new steam line starting from the steam collector to the potato peeler was performed.
View the case