{"id":12350,"date":"2026-11-18T10:21:07","date_gmt":"2026-11-18T09:21:07","guid":{"rendered":"https:\/\/www.engineeringexperts.be\/?p=12350"},"modified":"2026-11-18T10:21:07","modified_gmt":"2026-11-18T09:21:07","slug":"change-management-in-construction-projects-how-small-changes-can-have-major-consequences","status":"publish","type":"post","link":"https:\/\/www.engineeringexperts.be\/en\/blog\/change-management-in-construction-projects-how-small-changes-can-have-major-consequences\/","title":{"rendered":"Change Management in Construction Projects: How Small Changes Can Have Major Consequences"},"content":{"rendered":"<p><span data-contrast=\"auto\">Virtually every construction project is affected by change.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">A modified piping route, an additional foundation pedestal, a different instrument specification, or a new client requirement may appear minor at first glance. However, even seemingly small changes can significantly impact project schedules, budgets, and execution.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">That is why change management is a critical component of professional construction management.<\/span><\/p>\n<h3><strong><span class=\"TextRun SCXW36575682 BCX0\" lang=\"NL-NL\" xml:lang=\"NL-NL\" data-contrast=\"none\"><span class=\"NormalTextRun SpellingErrorV2Themed SCXW36575682 BCX0\" data-ccp-parastyle=\"heading 2\">Why<\/span><span class=\"NormalTextRun SCXW36575682 BCX0\" data-ccp-parastyle=\"heading 2\"> Changes Are <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW36575682 BCX0\" data-ccp-parastyle=\"heading 2\">Unavoidable<\/span><\/span><\/strong><\/h3>\n<p><span data-contrast=\"auto\">As projects progress, new insights and circumstances often emerge, such as:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Unforeseen site conditions.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Changing production requirements.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">New technical information.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Optimization opportunities identified during execution.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">The purpose of change management is not to prevent changes, but to ensure they are managed in a controlled and structured manner.<\/span><\/p>\n<h3><strong><span class=\"TextRun SCXW138330706 BCX0\" lang=\"NL-NL\" xml:lang=\"NL-NL\" data-contrast=\"none\"><span class=\"NormalTextRun SCXW138330706 BCX0\" data-ccp-parastyle=\"heading 2\">The <\/span><span class=\"NormalTextRun ContextualSpellingAndGrammarErrorV2Themed SCXW138330706 BCX0\" data-ccp-parastyle=\"heading 2\">Domino Effect<\/span><span class=\"NormalTextRun SCXW138330706 BCX0\" data-ccp-parastyle=\"heading 2\"> of a Single Change<\/span><\/span><\/strong><\/h3>\n<p><span data-contrast=\"auto\">A seemingly minor technical modification rarely affects just one discipline.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">For example, replacing a pump with a higher-capacity model can have implications across multiple engineering and construction disciplines:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<ul>\n<li><b><span data-contrast=\"auto\">Process Engineering:<\/span><\/b><span data-contrast=\"auto\"> Recalculation of flow rates, pressures, and safety valve settings.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Piping:<\/span><\/b><span data-contrast=\"auto\"> Larger pipe diameters, different flange specifications, and a revised pipe stress analysis.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Civil &amp; Structural:<\/span><\/b><span data-contrast=\"auto\"> A heavier pump foundation and additional support structures.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Electrical:<\/span><\/b><span data-contrast=\"auto\"> A larger motor, increased cable sizing, modifications to the MCC output, and revised protection settings.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Instrumentation &amp; Automation:<\/span><\/b><span data-contrast=\"auto\"> New measurement ranges, modified control loops, and updates to the DCS software.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Safety:<\/span><\/b><span data-contrast=\"auto\"> A HAZOP review and an update of the SIL assessment.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Documentation:<\/span><\/b><span data-contrast=\"auto\"> Revised P&amp;IDs, datasheets, and line lists.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Procurement &amp; Planning:<\/span><\/b><span data-contrast=\"auto\"> Extended equipment lead times that may delay installation activities.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><b><span data-contrast=\"auto\">Commissioning:<\/span><\/b><span data-contrast=\"auto\"> Updated test procedures and system re-tuning.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">Without a thorough impact assessment, seemingly small changes can quickly lead to unexpected delays and additional costs.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"1\"><strong><span class=\"TextRun SCXW196011364 BCX0\" lang=\"NL-NL\" xml:lang=\"NL-NL\" data-contrast=\"none\"><span class=\"NormalTextRun SpellingErrorV2Themed SCXW196011364 BCX0\" data-ccp-parastyle=\"heading 2\">What<\/span> <span class=\"NormalTextRun SpellingErrorV2Themed SCXW196011364 BCX0\" data-ccp-parastyle=\"heading 2\">Effective<\/span><span class=\"NormalTextRun SCXW196011364 BCX0\" data-ccp-parastyle=\"heading 2\"> Change Management <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW196011364 BCX0\" data-ccp-parastyle=\"heading 2\">Achieves<\/span><\/span><\/strong><\/h3>\n<p><span class=\"TextRun SCXW24736516 BCX0\" lang=\"NL-NL\" xml:lang=\"NL-NL\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW24736516 BCX0\">Professional change management <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW24736516 BCX0\">evaluates<\/span> <span class=\"NormalTextRun SpellingErrorV2Themed SCXW24736516 BCX0\">every<\/span> <span class=\"NormalTextRun SpellingErrorV2Themed SCXW24736516 BCX0\">proposed<\/span><span class=\"NormalTextRun SCXW24736516 BCX0\"> change <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW24736516 BCX0\">based<\/span><span class=\"NormalTextRun SCXW24736516 BCX0\"> on <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW24736516 BCX0\">several<\/span> <span class=\"NormalTextRun SpellingErrorV2Themed SCXW24736516 BCX0\">key<\/span><span class=\"NormalTextRun SCXW24736516 BCX0\"> criteria:<\/span><\/span><span class=\"EOP Selected SCXW24736516 BCX0\" data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p aria-level=\"3\"><b><span data-contrast=\"none\">Technical Impact<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:246,&quot;335559739&quot;:246,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Which systems, equipment, disciplines, or interfaces will be affected?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p aria-level=\"3\"><b><span data-contrast=\"none\">Schedule Impact<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:246,&quot;335559739&quot;:246,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Will the change affect project milestones, critical-path activities, or overall project delivery dates?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p aria-level=\"3\"><b><span data-contrast=\"none\">Financial Impact<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:246,&quot;335559739&quot;:246,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">What additional costs may arise from engineering, procurement, construction, commissioning, or rework?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p aria-level=\"3\"><b><span data-contrast=\"none\">Risk Impact<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:246,&quot;335559739&quot;:246,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Does the change introduce new safety, operational, quality, or execution risks?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p aria-level=\"3\"><b><span data-contrast=\"none\">Interface Impact<\/span><\/b><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;134245418&quot;:true,&quot;134245529&quot;:true,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:246,&quot;335559739&quot;:246,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Which contractors, suppliers, owners, or project stakeholders need to adjust their activities as a result of the change?<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"2\"><strong>Why Many Projects Lose Control\u00a0<\/strong><\/h3>\n<p><span data-contrast=\"auto\">Projects without a structured change management process often rely on informal decision-making.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">This frequently results in:<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<ul>\n<li><span data-contrast=\"auto\">Unclear ownership and responsibilities.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Incomplete impact assessments.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Budget overruns.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\">Disputes and discussions during later project phases.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:300}\">\u00a0<\/span><\/li>\n<\/ul>\n<p><span data-contrast=\"auto\">By formally documenting and approving changes, all stakeholders remain aligned on what was changed, why it was changed, and what the resulting consequences are.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<h3 aria-level=\"2\"><strong>Conclusion\u00a0<\/strong><\/h3>\n<p><span data-contrast=\"auto\">Change is a natural and unavoidable part of every construction project.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">The difference between successful projects and problematic ones is not the number of changes that occur, but how those changes are managed.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n<p><span data-contrast=\"auto\">Professional change management ensures that every modification is assessed, documented, approved, and implemented in a controlled and transparent manner, helping project teams maintain control over schedule, budget, quality, and execution throughout the project lifecycle.<\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:210,&quot;335559739&quot;:210,&quot;335559740&quot;:300}\">\u00a0<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Virtually every construction project is affected by change.\u00a0 A modified piping route, an additional foundation pedestal, a different instrument specification,&#8230;<\/p>\n","protected":false},"author":8,"featured_media":12356,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1667],"tags":[],"class_list":["post-12350","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-geen-onderdeel-van-een-categorie"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/posts\/12350","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/comments?post=12350"}],"version-history":[{"count":1,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/posts\/12350\/revisions"}],"predecessor-version":[{"id":12351,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/posts\/12350\/revisions\/12351"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/media\/12356"}],"wp:attachment":[{"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/media?parent=12350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/categories?post=12350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.engineeringexperts.be\/en\/wp-json\/wp\/v2\/tags?post=12350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}